Please try another search
Symbol | Exchange | Currency | ||
---|---|---|---|---|
RLIN | NSE | INR | Real-time | |
RLIN | Derived | INR | Real-time | |
RLENq | London | USD | Real-time | |
RLIN | BSE | INR | Delayed |
Reliance Infrastructure Limited, an infrastructure company, generates, transmits, and distributes electrical power to residential, industrial, commercial, and other consumers in India. It operates through three segments: Power; Engineering and Construction (E&C); and Infrastructure. The Power segment operates a 220 MW combined cycle power plant at Samalkot; 48 MW combined cycle power plant at Mormugao; and 9.39 MW wind farm at Chitradurga. This segment also distribute power in Delhi; operates a 165 MW combined cycle power plant at Kochi; and trades in power. The E&C segment offers value added services in construction, erection, commissioning, and contracting. The Infrastructure segment engages in the development, operation, and maintenance of toll roads, metro rail transit system, and airports. It also involved in the exploration and production of 4 coal bed methane blocks covering an area of 3,266 square kilometers in Madhya Pradesh, Andhra Pradesh, and Rajasthan; exploration and production of CBM gas block; and rehabilitation and upgradation of NH-66. In addition, the company manufactures cement and defense systems; offers urban transport systems; and develops real estate property. Reliance Infrastructure Limited was incorporated in 1929 and is based in Mumbai, India.
Name | Age | Since | Title |
---|---|---|---|
Ryna Zaiwalla Karani | 54 | 2014 | Independent Director |
Punit Garg | 57 | 2019 | CEO & Executive Director |
Manjari Ashok Kacker | 72 | 2019 | Non-Executive Independent Director |
Thomas Mathew | 68 | 2024 | Independent Director |
Virendra Singh Verma | 73 | 2024 | Additional Non-Executive Independent Director |
Chhaya Virani | 70 | 2022 | Non-Executive Independent Director |
Partha Pratim Sarma | 53 | 2024 | Non-Executive Non-Independent Director |
Are you sure you want to block %USER_NAME%?
By doing so, you and %USER_NAME% will not be able to see any of each other's Investing.com's posts.
%USER_NAME% was successfully added to your Block List
Since you’ve just unblocked this person, you must wait 48 hours before renewing the block.
I feel that this comment is:
Thank You!
Your report has been sent to our moderators for review